back

Pavilions 4 and 7 Completed

In April of 2015, the latest phase of construction in Siegmunds Hof was finalized with the completion of Pavilions 4 and 7. The two 3-storey buildings were renovated and modernized indoors and out respecting the historically-listed nature of the project.

A restructuring on the ground-floor extends the common areas and strengthens the relationship to the outdoors through the use of additional entrances and mirrored surfaces. The new organization of the sanitary-spaces and the design of the dorm rooms are better suited to the current needs of today’s students.

More information here!